We also straightened the walls, added additional framing at the sill and re-bolted everything to the frame. Corrected the bend in the rear section of the frame and replaced broken bolts in the frame. 12V and 120 V wiring is next including a Progressive Dynamics 4045: 45 Amp Converter + AC/DC Distribution Panel, followed by the rigid R-6 insulation in the walls. Then on to framing the sink cabinet with new plumbing and grey water and fresh water holding tanks. New birch plywood interior panels will be stained to match the existing. I can't wait to go camping in our little Kaiser.
We also straightened the walls, added additional framing at the sill and re-bolted everything to the frame. Corrected the bend in the rear section of the frame and replaced broken bolts in the frame. 12V and 120 V wiring is next including a Progressive Dynamics 4045: 45 Amp Converter + AC/DC Distribution Panel, followed by the rigid R-6 insulation in the walls. Then on to framing the sink cabinet with new plumbing and grey water and fresh water holding tanks. New birch plywood interior panels will be stained to match the existing. I can't wait to go camping in our little Kaiser.
ReplyDeleteWe need more pictures ;)
ReplyDelete