The exterior has the most work left of our little project. Many of the dents have been hammered out, but not all and they never will be. The door has been rebuilt and reinstalled. A new threshold using aluminum angle has also been installed. This is the one part of the floor that get the most use and heaviest point loads. The threshold has really made the floor much more sturdy.
No comments:
Post a Comment